Intelligent Economic Scheduling for Multi-type Cooling System in High Buildings

Chuhui LIU,Yi ZHENG,Xu CAI,Hui CHEN
DOI: https://doi.org/10.3969/j.issn.1674-8417.2014.08.003
2014-01-01
Abstract:Focusing on muti-type cooling system,the economical models of different kinds of equipment were introduced,and a bi-level optimal scheduling method was proposed.The mixed integer programming method was used on the upper level to optimize the on-off state of cooling device in the long period according to load prediction,and the quadratic programming method was used on the lower level to optimize the load working cooling device bears in the short period.Taking a certain building as an example,the scheduling method was analyzed.It could provide references for multi-type cooling system.
What problem does this paper attempt to address?