Safety Construction Technology for the Muti-cavern Tunnel of Guiyang Subway

Jinfang Yi,Songbai Lu,Junying Rao,Tao Xie
DOI: https://doi.org/10.7672/sgjs2016130101
2016-01-01
Abstract:Taking Guiyang subway No. 1 line from Railway station to the Shachong Road station tunnel construction for study, through discussing and practicing the karst caves treatment technology of filled caves at arched portion, miniature dissolution cavities, karst caves with the risk of water and mud outburst, the water inflow of caves when main tunnel ahead explorating water, the caves that did not be revealed by ahead explorating water but water infolded after excavation and the types of karst caves which was exposed above the parts of tunnel springing line. The results show that it is effective to protect the construction safety of the muti?cavern tunnel of Guiyang subway by the means of enough preparing before the tunnel excavation, geological forecast, treat the karst caves by the methods in this paper, control the drill footage strictly and supporting in time.
What problem does this paper attempt to address?