Influence of delay period on chloride ions binding capacity of cement-based materials

Dongdong PAN,Jian GENG,Dong LI,Yue FENG
DOI: https://doi.org/10.3969/j.issn.1002-3550.2018.02.002
2018-01-01
Abstract:The chloride ion curing ability of cement-based materials with different delay period under steam curing conditions was studied by adsorption equilibrium method.The results show that the mineral admixture fly ash and slag powder can obviously improve the binding capacity of chloride ion of cement-based materials under the condition of steam curing,and the effect of slag powder on the improvement of chloride ion is better than that of fly ash.Under the condition of constant temperature and constant temperature,the chloride ion in the cement-based material decreases with the increase of the delay period,and the cement-based materials with 2 hours delay period shown the highest chloride ions binding.
What problem does this paper attempt to address?