Case Study on the Comprehensive Treatment of Cross-regional Black and Odorous Water in Chongqing Xinhua Reservoir Basin

Jun-wei JIN,Sheng-lan BI,Lan CAI,Jie LIU,Zhong-sheng PAN
DOI: https://doi.org/10.19853/j.zgjsps.1000-4602.2018.02.024
2018-01-01
Abstract:The design idea and technical roadmap for comprehensive treatment project of black and odorous water in Chongqing Xinhua Reservoir Basin were introduced.The major obstacles to comply with class V criteria specified in the Environmental Quality Standards for Surface Water (GB 3838-2002),such as continuous importation of external pollutants in the basin and the difficulty of interception,the lack of internal pollution treatment,and the lack of linkage mechanism between administrative regions were analyzed.Both the engineering remediation measures and non-engineering measures such as strengthening watershed linkage coordination from source control and intermediate treatment to end repairwere elaborated in order to provide technical reference for the comprehensive treatment of cross-regional black and odorous water in mountainous city.
What problem does this paper attempt to address?