Reconstruction Design of Rainwater Pipe Network in Old Urban District Based on Drainage Load of Pipeline

Xiang-ying ZENG,Er LI,Shi-xiong RAO,Hui-jun ZOU,Pei-hong HE,Ya-jun SHI,Fan LUO,Tao TAO,Hong-feng WANG
DOI: https://doi.org/10.19853/j.zgjsps.1000-4602.2018.08.015
2018-01-01
Abstract:In view of the urgent demand for upgrading the rainwater pipe network in old urban district and the limited implementation conditions, the method of the design for the reconstruction based on pipeline drainage load index was put forward in order not to completely reconstruct the rainwater pipe network in the whole area. Based on the design drainage standard, guided by the drainage load index, some methods were adopted to achieve the upgrading drainage capability of the rainwater pipe network such as integrating rainwater pipe network of the area, setting up different pipeline drainage load degrees, and reducing the drainage load of rainwater pipe network by appropriately increasing the density of rainwater pipeline layout in the area. Besides, pumps were coordinated to sluices so as to increase the pipe hydraulic gradient. Taking there construction of rainwater pipe network in the old urban district adjacent to the Yangtze River of Qingshan District in Wuhan as an example, the specific design based on this method was introduced, the actual operation results showed that the area experienced several rainfall for 1-5 years, and no water has been accumulated at the original water accumulation point, which achieved the expected reconstruction performance.
What problem does this paper attempt to address?