Reconstruction of High-salt Propylene Epoxide Production Wastewater Treatment

Tian-xiang HUI,Xiao-jun WANG
DOI: https://doi.org/10.19853/j.zgjsps.1000-4602.2017.06.020
2017-01-01
Abstract:A large amount of saturated Ca(OH) 2,CaCl2 and high strength of organic chlorides existed in the wastewater from conventional chlorohydrin propylene epoxide production process in a chemical company in Shandong.As a result,the treatment performance of the first stage of this wastewater with the capacity 30 000 m3/d was poor and unstable.Even though a number of treatment modules including primary sedimentation tank/activated sludge aeration tank/secondary settling tank/contact oxidation tank/coagulation sedimentation tank were combined in the first stage of the project.Therefore,it was necessary to upgrade this treatment process to a high level.After rebuilding a middle tank/ABR/aerobic tank between secondary settling tank and contact oxidation tank,setting up anoxic HRT ∶ aerobic HRT as 3 ∶ 2,and controlling MLSS over 15 g/L,the treatment performance of the upgraded process was stable and the effluent reached the Integrated Wastewater Discharge Standard in Xiaoqing River Basin of Shandong Prvince(DB 37/656-2006).
What problem does this paper attempt to address?