Running effectiveness of integrated constructed wetland on purifying discharge from waste water treatment plant in cold season

Changkuan ZHANG,Qijun NI,Dong YANG,Liang ZHONG,Meihua DENG,Xiao'e YANG
DOI: https://doi.org/10.12030/j.cjee.201510119
2017-01-01
Abstract:To improve the running effectiveness of a constructed wetland in cold weather,a greenhouse was built in front of the constructed wetland and different techniques were integrated to purify the discharge from the Linan Sewage Water Treatment Plant (60 000 t · d-1).The running effectiveness of the wetland was analyzed in both winter and spring.The results showed that the removal rate of ammonium nitrogen (NH4+-N),nitrate nitrogen (NO3--N),total nitrogen (TN),total phosphor (TP),and chemical oxygen demand (COD) in cold winter from December to February averaged 68%,34%,39%,87%,and 34%,respectively.The pollutant treatment capacity in winter was similar with that of spring (March to May).The results indicate that the integrated wetland system with added greenhouse subsystems significantly improved the pollutant treatment efficiency in cold weather.
What problem does this paper attempt to address?