Timeliness Testing of GF-4 Satellite Data Product and Disaster Reduction Application Service

Wei WU,Qiming QIN,Yida FAN,Ming LIU,Yang SHU
DOI: https://doi.org/10.3969/j.issn.1009-8518.2016.04.014
2016-01-01
Abstract:The timeliness of GF-4 satellite data product and application service is a hot issue of common concern of the project construction, management and application departments, and an important indicator of GF-4 satellite quick service capability during disaster emergency. In this paper, according to GF-4 satellite and its payload imaging characteristics, disaster reduction application demands are analyzed based on different satellite imaging modes. A testing scheme of data service timeliness in GF-4 satellite gazing, region and mobile patrol imaging modes, and a testing scheme of the timeliness of the production of disaster reduction application products are put forward. The results show that the GF-4 satellite has a strong flexibility and high timely observation capabilities, the shortest time of full link GF-4 satellite data and disaster reduction application products can be within 1.5 hours. The test shows that the time are short for the satellite observation plan and the satellite emergency observation and the reaction speed is relatively high, but the duration of the ground data processing, distribution and transmission is influenced by many factors and changes largely in different imaging modes. With GF-4 satellite stable operation for long-term, data services will become more and more mature and stable. Thus, the timeliness of data service in the whole link will be further improved, and the supporting role of data application service will become increasingly prominent in the national disaster prevention and mitigation.
What problem does this paper attempt to address?