Numerical Analysis of Post-Construction Subway Settlement and Variation of Pore Pressures under the Influence of Construction Disturbance

Kai CHEN,Zhi DING,Xiaowei GU,Xinjiang WEI,Guobao GE
DOI: https://doi.org/10.13807/j.cnki.mtt.2017.01.018
2017-01-01
Abstract:At present, the subsoil deformation and pore pressure variation caused by metro construction have re?ceived extensive attention. Based on the Henkel pore pressure theory under three-dimensional stress conditions, the initial excess pore pressure at a tunnel spring line was obtained. The post-construction consolidation of the Hang?zhou metro was simulated through the establishment of a three-dimensional finite-element model by MIDAS-GTS, and the subsoil settlement and distribution of the pore pressure at different time periods due to construction distur?bance was analyzed. The results show that:the distribution of excess pore pressure is symmetrical and its dissipation is consistent with the subsoil consolidation degree after construction;consolidation settlement mainly occurs at the beginning of shield tunnelling and reaches a maximum at the ground;and the variation of pore pressure caused by metro operation decreases with an increase of the consolidation degree.
What problem does this paper attempt to address?