Inf luence Analysis of Quarry Blasting on Adjacent Tunnel

Zhichun FANG,Zhimin CHEN
DOI: https://doi.org/10.3969/j.issn.1003-1995.2018.04.21
2018-01-01
Abstract:During mining blasting,a large part of energy released from explosive in rock and soil can be converted into seismic waves,which may cause damage to tunnel surrounding rock or existing construction structures.In order to evaluate the impact of the mining activities on the safety of the tunnel structure,the numerical analysis method was used to analyze the stress and displacement on the blasting side of the tunnel lining concrete in the existing railway. The results show that the maximum tensile stress of the arch foot on the blasting side of the lining is 4.32 MPa, which exceeds the standard design value of the tensile strength for C25 concrete,the arch shoulder compressive stress reaches 9.6 MPa.The overall bearing capacity on the blasting side of tunnel lining obviously decreases,the horizontal tensile failure is prone to occur at the arch shoulder on the blasting side,which is the most dangerous area,in a long period of blasting,especially after a crack in the lining.
What problem does this paper attempt to address?