Synthetic advanced prediction technology for super-long broken tunnel in karst area

He-wen LIU,Yu ZHANG,Yu-bin GUO,Bin-bin XU,Fang-long YUAN,Zong-gao JIANG
DOI: https://doi.org/10.7640/zggwjs201709008
2017-01-01
Abstract:The projectof Laoying-mountain tunnel located in typical karst area,it would run into super-long broken zone which has 350 m long as passing through the fault.In order to reduce the construction risk of tunnel project,we used forecasting technology to obtain the information in front of face rock layer.At first,according to the geological exploration data and the potential geological disasters in excavation,combined with the characteristics of various geophysical methods,we developed the synthetic advanced prediction technologies for the Laoying-mountain tunnel,includes the following:face catalog,seismic wave method (TSP),ground penetrating radar (GPR) and infrared water.We also analyzed the characteristic of abnormal signal in k 15+930 at the right of the tunnel,and verified the results by the actual excavation.The practical application results are proved nice.The related prediction methods,detection methods and signal analysis methods can be used as reference for the prediction for the long broken tunnel in the karst area,and its promotion will have practical significance.
What problem does this paper attempt to address?