Advanced Planning and Scheduling System Based on Multi-resource Closed-loop Management

X. Yuan,Y. W. Chen,B. Liu,X. G. Ming
DOI: https://doi.org/10.1109/ieem45057.2020.9309935
2020-01-01
Abstract:Recently, advanced planning and scheduling system (APS) has drawn wide attention. In this paper, we proposed an APS system that fully coordinates human management, equipment management, material management, logistics management, process management. It covers these five areas to make production plans and achieve higher levels of lean production management goals, simultaneous and parallelize planning, better efficiency, process optimization and closed-loop management. It performs better global optimization by coordinating all the sub-components rather than using only MES, WMS or PCS.
What problem does this paper attempt to address?