Abstract:This paper analyzes the data about the ground stress of the Yinping Hydropower Station in Sichuan .By using ANSYS software as a development platform ,the three-dimensional calculation model has been built .By applying the displacement function method ,the data of initial stress field have been obtained .At the same time ,the principal stress distribution of the detailed model and the principal stress near the underground excavation have been analyzed .The result shows that the analytic results of initial stress fields are in accord with the stress values of the measured points .It can be applied to the analyze the stability of the detailed model of the underground excavation .