Study on Real-Time Optimized Operation of Cascade Hydropower Stations Based on Market Price Bidding

万毅,练继建,刘学海,马超
DOI: https://doi.org/10.3969/j.issn.1000-0860.2005.10.015
2005-01-01
Abstract:Based on the analysis made on the electric power market and the method of the transaction settlement for hydropower,the market price bidding strategy for the cascade hydropower stations is studied,and then the mathematic model and optimal concept for the calculation of the market clearing price are established,i.e.the price bidding mode for the optimized operation ofoptimal model for maximum power output-system model for minimum cost of power generation-model for maximum benefit of hydropower station groupfor cascade hydropower station group.Furthermore,both the feasibility and availability of the established model are demonstrated herein by taking the cascade hydropower stations on Shuoduogang River as the actual case.
What problem does this paper attempt to address?