A grey time-sequential combined model for dynamic prediction of foundation pit displacement

冷伍明,肖武权
DOI: https://doi.org/10.3969/j.issn.1000-3665.2005.01.028
2005-01-01
Abstract:Deformation of foundation pit is a dynamic dependent process. During the pit excavation and construction, a grey time series combined model can be used to predict the deformation. The displacement trend value is calculated by using a grey model. And the random value is calculated by using a time series model. On the basis of a series of displacement data at the moment, grey and time sequential model can be established respectively. With the addition of new deformation data, the model parameters are continuously modified. The deformation prediction of the foundation pit has showed that the error between measure and prediction value is mostly below 5 percent. Under the condition of small and unstable data, the combined prediction value is superior to the single grey model. But with the more and stable data, the prediction deformation value difference by combined or single model is little. The more prediction steps are, the errors are.
What problem does this paper attempt to address?