An Effective Approach for the Dual-Resource Flexible Job Shop Scheduling Problem Considering Loading and Unloading.

Wu, Xiuli,Peng, Junjian,Xiao, Xiao,Wu, Shaomin
DOI: https://doi.org/10.1007/s10845-021-01859-z
IF: 8.3
2020-01-01
Journal of Intelligent Manufacturing
Abstract:Many manufacturing systems need more than one type of resource to co-work with. Commonly studied flexible job shop scheduling problems merely consider the main resource such as machines and ignore the impact of other types of resource. As a result, scheduling solutions may not put into practice. This paper therefore studies the dual resource constrained flexible job shop scheduling problem when loading and unloading time (DRFJSP-LU) of the fixtures is considered. It formulates a multi-objective mathematical model to jointly minimize the makespan and the total setup time. Considering the influence of resource requirement similarity among different operations, we propose a similarity-based scheduling algorithm for setup-time reduction (SSA4STR) and then an improved non-dominated sorting genetic algorithm II (NSGA-II) to optimize the DRFJSP-LU. Experimental results show that the SSA4STR can effectively reduce the loading and unloading time of fixtures while ensuring a level of makespan. The experiments also verify that the scheduling solution with multiple resources has a greater guiding effect on production than the scheduling result with a single resource.
What problem does this paper attempt to address?