Measuring the Value of Windbreak and Sand-fixation in the Sandstorm Source Control Project in and around Beijing and Tianjin based on CVM's Different Inquiry Methods

Bo Huang,Yinchu Zeng,Yarong Lue,Mitsuyasu Yabe
2012-01-01
Journal of the Faculty of Agriculture Kyushu University
Abstract:Based on the Contingent Value Method (CVM), this paper uses a telephone interview to random sampling residents in Beijing to survey the annual household's willingness to pay for the value of windbreak and sand-fixation effects in the Sandstorm Source Control Project around the Beijing and Tianjin (Project); at the same time the annual economic value of the Program is calculated. The result of the research shows that in Beijing, with open-ended method, per household's willingness to pay for Project is from 100 to 136.81 CHY (Chinese Yuan) on average; while it's from 110 to 143 CHY with double-bounded dichotomous choice method. According to the WTP of local residents, the evaluated annual value of Project is from 611 to 642 million CHY.
What problem does this paper attempt to address?