Construction and Denitrification Performance of A2/O Based on Partial Nitrification Coupled with an ANAMMOX System

Xiao-chai LIU,Yi RONG,Li-jie WEN,Dang-yong LI,Peng-kang JIN
DOI: https://doi.org/10.13227/j.hjkx.201910190
2020-01-01
Abstract:To resolve the issue of existing municipal wastewater treatment plants (WWTPs) in China with an insufficient influent carbon source, a bench-scale A/O process based on partial nitrification coupled with ANAMMOX was constructed by controlling aeration partition ratio, dissolved oxygen (DO) concentration, and sludge retention time (SRT). In this study, the nitrogen removal performance, nitrogen removal pathway, and microbial community structure of the system under different conditions were investigated. The results showed that the system had excellent nitrogen removal efficiency at low-C/N influent (C/N=5). The A/O reactor had experienced the co-culture stage (Phase 1), screening stage (Phase 2-3), and enrichment stage (Phase 4) successively during the 140-day experiment, and the nitrogen removal pathway changed from nitrification and denitrification to partial nitrification coupled ANAMMOX in the end. The optimal removal efficiencies of 97.69% for NH-N and 87.83% for TN were obtained in the enrichment stage (Phase 4), and the effluent concentration of NH-N and TN were 1.20 mg·L and 7.03 mg·L, respectively. Illumina MiSeq sequencing results showed that the enrichment of AOB including and and the elimination of NOB including , , and were the main causes of achieving partial nitrification in the system. The enrichment of AnAOB including and was the key point for the occurrence of ANAMMOX in the system, and thus, played an important role in the achievement of advanced nitrogen removal.
What problem does this paper attempt to address?