On Startability of EGSB Reactor

左剑恶,王妍春,陈浩,左宜,申强
DOI: https://doi.org/10.13789/j.cnki.wwe1964.2001.03.009
2001-01-01
Abstract:Two bench-scale expanded granular sludge bed (EGSB) reactors inoculated of flocculants (R1) and granules (R2) of anaerobic sludge were conducted to research their startability of wastewater treatment processes. The results of the experiment show that the startup of reactor R1 spent in 78 days totally because much sludge lost as a result of effluent recycling and so it had to operate as UASB reactor first to make up sludge granules and then operated as EGSB; the reactor R2 with suitable recycling rate was favorable to bacteria growth and operated normally, after short time without recycling for sludge assimilation, the EGSB started up successful only in 32 days.
What problem does this paper attempt to address?