Advanced Removal of Nitrogen and Phosphorus in Combined Pilot System of Sulfur and Iron

Zheng-ming REN,Jia-li CHANG,Xue-jie LIU,Xiao-lei SU,Ji LI,Peng LIANG,Xia HUANG
DOI: https://doi.org/10.19853/j.zgjsps.1000-4602.2017.13.021
2017-01-01
Abstract:Advanced removal of nitrogen and phosphorus was achieved in the combined pilot system of sulfur and iron.Based on the building of the pilot sulfur and iron packed-bed,operating parameters of the system were optimized,and the microbial community was analyzed.The results showed the sulfur and iron coupled packed-bed reactor could effectively remove NO3--N from the secondary effluent.85% of NO3--N was removed when the HRT was longer than 0.29 h.The maximum nitrogen load was 1 023 mg/(L · d),when HRT was 0.29 h and the influent NO3--N was 16.5 mg/L.The effluent phosphate concentration was lower than 0.5 mg/L.After the backwash,FePO4 precipitate was discharged,and the system reached a stable status.The pilot system resumed to normal performance within 0.5 h after the backwash.Microbial community analysis showed that the relative abundance of Thiobacillus in the top and middle layers of filler was higher,which was 14% and 17%,respectively,and the relative abundance of Sulfurimonas (13%) in bottom layers was higher than others.
What problem does this paper attempt to address?