A Phased and Progressive Modeling Method of BIM

Fangqiang YU,Jianping ZHANG
DOI: https://doi.org/10.11996/JG.j.2095-302X.2017010097
2017-01-01
Abstract:BIM technology has been rapidly developed over the past 10 years. However, it's still difficult to deliver information smoothly between different phases due to that there are many participants involved in a building project. Consequently, a completed BIM still can't be constructed. To address this problem, this paper proposes a phased and progressive modeling method (PPMM) of BIM, together with a basic agreement for cooperative modeling among all participants, and modeling procedures. The method supports various participants to cooperatively create BIM under a unified framework. Being verified by a real project, the PPMM is effective for preventing from repetitive modelling and inconsistent data, and is helpful for generating a completed and consistent BIM in BIM database, which is a foundation of building lifecycle-oriented BIM application.