Implementation of a dual estimate tracking based multipath mitigation method on a software receiver

Chuhan Wang,Xiaowei Cui,Mingquan Lu,Yang Gao
DOI: https://doi.org/10.1007/978-981-13-0029-5_29
2018-01-01
Abstract:Binary Offset Carrier modulated signal, which will widely be used in next generation Global Navigation Satellite Systems, has multi peaks in the auto-correlation function. In practical application condition, multipath and ambiguity are two main problems that can serious degrade the GNSS receiver ranging precision due to the feature of multi peaks. To solve the ambiguity problem, we typically adopt Dual Estimate Tracking (DET) that treats the subcarrier independently and tracks it by an additional loop. However, the DET multipath mitigation structure is not specially considered yet due to the complex features of two-dimension cross-correlation function. In this paper, we implement a DET based anti-multipath method for BOC modulated signals, which mitigates the direct influence by an earlier phase Pseudo-Noise code instead of the prompt for subcarrier locked loop and the indirect influence by the Double Delta method for delay locked loop. A software receiver further proves the achievability of the multipath mitigation method and the results show that this method can significant reduce the short and mediate range delay multipath error at the expense of increasing the long range delay multipath error a little. This method can also achieve the compromise between multipath and noise performance by adjusting the local Pseudo-Noise code phase for different application scenarios.
What problem does this paper attempt to address?