Mtof Performance During the First Main Commissioning Beam Time at Mcbm

Q. Zhang,I Deppner,N. Herrmann,Y. Wang
DOI: https://doi.org/10.1088/1748-0221/15/12/c12007
2020-01-01
Journal of Instrumentation
Abstract:The future Facility for Anti-proton and Ion Research (FAIR), currently inconstruction in Darmstadt, Germany, is one of the largest research projectsworldwide. The Compressed Baryonic Matter (CBM) experiment is one of the mainpillars at FAIR, studying the quantum chromodynamics (QCD) phase diagram athigh baryon densities with unprecedented interaction rate in heavy ioncollisions up to 10 MHz. This requires new data-driven readout chain, new dataanalysis methods and high-rate capable detector systems. The task of the CBMTime of Flight wall (CBM-TOF) is the charged particle identification. Multi-gapResistive Plate Chambers (MRPCs) with different rate capabilities will be usedat CBM-TOF corresponding regions. To reduce the commissioning time for CBM, aCBM full system test-setup called mini-CBM (mCBM) had been installed and testedwith beams at GSI SIS18 facility in 2019. The high-rate MRPC prototypesdeveloped at Tsinghua University, called MRPC2, were selected to be implementedin mTOF modules for mCBM. Additional thin float glass MRPCs from USTC calledMRPC3, foreseen for the CBM lower rate region, were also tested in the mCBMexperiment. Performance results of the two kinds of MRPCs analyzed by the socalled tracking method will be shown.
What problem does this paper attempt to address?