A Trade-off Method for Timetable Rescheduling Considering Transfer Connections in Subway Networks

Wenkai Xu,Binglei Xie,Liqiao Ning
DOI: https://doi.org/10.1142/s021798492050253x
2020-01-01
Modern Physics Letters B
Abstract:This study is devoted to handle disturbances occurring in a subway network during the off-peak period. By dissecting the relationship of transfer connections between connected lines, transfer passengers and non-transfer passengers as well as operating agencies are taken into consideration, respectively, and a trade-off method for timetable rescheduling is proposed to minimize the waiting time of all transfer passengers as well as the deviation from the planned timetable. We adopt the [Formula: see text]-constraint method to convert the bi-objective model to an integer linear programing model with single objective, which can be solved by CPLEX within seconds. The method is validated by some numerical experiments based on a real-world case derived from the Beijing Subway network. Results show that the proposed method is able to generate approximate Pareto optimal solutions and to provide decision support for dispatchers.
What problem does this paper attempt to address?