Monitoring Analysis of the Underground Cavities in Pubugou Hydropower Station during the Construction Period
Zheng Jun,Deng Jianhui,Tan Shengkui,Yang Xiaojuan,Huang Qiuxiang,Lv Hongxu
DOI: https://doi.org/10.3969/j.issn.1673-0836.2011.02.024
2011-01-01
Abstract:Underground cavities of Pubugou Hydropower Station,including six diversion tunnels,underground powerhouse,the main transformer room,the tailwater room and two tail-water tunnels,were arranged on the right bank of the Dadu River in the granite mountain.This paper,based on caverns layout,engineering geological conditions,monitoring design and implementation,focused on analysis of cavern deformation and distribution characteristics of the underground plant,the main transformer room and the tailwater room,and evaluated stability of the cavern group.Pubugou rock caverns' overall quality is better,so the deformation of the surrounding rock is smaller during the construction process and is generally less than 40mm,but due to structural surface effect the maximum deformation is up to 105 mm;The parts of rock with large deformation mainly found in the upper side wall,such as the main plant site near by.The structure plays main role in controlling rock deformation,so differences between its upper and lower plate deformation led to cracking in the rock-anchored beam during construction process.Therefore,monitor design of the chamber group and rock-anchored beam structure design would require consideration of these local variations in deformation behavior.Limitation of surrounding rock deformation characteristics are not significant.As excavation was over,the rock deformation and stress convergence speed become stable,the displacement changes with basic rate of 1mm / month or less,the basic rate of stress change is 5MPa / month or less,the cavity is in good condition.