Minimizing the Total Completion Time of an Urban Delivery Problem with Uncertain Assembly Time

Bingbing Liu,Xiaolong Guo,Yugang Yu,Qiang Zhou
DOI: https://doi.org/10.1016/j.tre.2019.11.002
2019-01-01
Abstract:This paper studies a stochastic programming problem to minimize the total completion time consists of the travel time and the assembly time, for a new class of urban delivery problems. The problem is formulated into a chance-constrained programming problem and the probability distribution characteristics of the uncertainty of product assembly time are obtained using a statistical learning method. Then the original chance-constrained programming problem can be converted into an equivalent deterministic programming problem. Subsequently, an algorithm consisting of two sub-heuristics is proposed to solve the deterministic problem. Finally, comprehensive numerical experiments with real dataset show the superiority of the model and the algorithm.
What problem does this paper attempt to address?