A Note on Single-Machine Scheduling to Tradeoff Between the Number of Tardy Jobs and the Start Time of Machine.

Qiulan Zhao,Jinjiang Yuan
DOI: https://doi.org/10.1016/j.orl.2019.10.009
IF: 1.151
2019-01-01
Operations Research Letters
Abstract:We consider the single-machine scheduling to tradeoff between the number of tardy jobs and the start time of machine. For this problem, Hoogeveen and T’kindt (2012) proposed an O ( n 4 ) algorithm and Gafarov et al. (2010) gave an O ( n 2 ) algorithm. In this paper, we present an improved O ( n log n ) algorithm. This also provides a new O ( n log n ) algorithm for problem 1 | | ∑ U j.
What problem does this paper attempt to address?