Shortage Index and Shortage Time of Uncertain Production Risk Process

Waichon Lio,Baoding Liu
DOI: https://doi.org/10.1109/tfuzz.2019.2945246
IF: 12.253
2020-01-01
IEEE Transactions on Fuzzy Systems
Abstract:One type of production problem is concerned with a sequence of production cycles in which the cycle time (i.e., the length of each cycle) and reward (e.g., production amount or cost) are characterized in terms of uncertain variables (not random variables). In order to deal with this problem, this article proposes an uncertain production risk process. Moreover, the concepts of shortage index and shortage time of the uncertain production risk process are proposed, and the formulas for shortage index and the uncertainty distribution of shortage time are also derived. Finally, some numerical experiments are performed to illustrate the model and formulas.
What problem does this paper attempt to address?