Study on Application of New Generation Large Capacity Synchronous Condenser in Power Grid

WANG Yating,ZHANG Yichi,ZHOU Qinyong,LI Zhiqiang,JIANG Yilang,TANG Yong,WU Junling,GAO Chao,TU Jingzhe,SHEN Chen
DOI: https://doi.org/10.13335/j.1000-3673.pst.2016.0715
2017-01-01
Abstract:Application of new synchronous condenser in UHVDC sending and receiving ends is analyzed in this paper. Firstly, consideringtechnical requirements ofUHVDC synchronous condenser, models of synchronous condenser are studied andsubtransient/transient/steady characteristicsare proposed for different time scales. Then for sending end of Jiuquan-Hunan wind-thermal-bundled UHVDC, application effects of synchronous condenser are discussed from aspects of increasing shortcircuitratio,reducingrisk ofrenewableenergy overvoltage tripping andrestrainingsteady-stateovervoltage. For receiving end of multi-infeed HVDC transmission lines in EastChina, application effects of synchronous condenser are discussed from aspects of increasing multi-infeedshortcircuit ratio, reducingcommutation failurerisk of multiple HVDC, and improving voltage stability level under severefaults. Lastly, compared with traditional synchronous condenser, equipment advantagesof new generation are proposed, such asoperation&maintenance,reactive response characteristics,etc, providing technical support forsubsequentengineering application.
What problem does this paper attempt to address?