Analysis on Differences of Applying Sequential Monte Carlo Methods in Power Gird Reliability Assessment

BAO Yingkai,WANG Yue,TANG Junxi,GUO Chuangxin,WANG Xing,SHI Hui
DOI: https://doi.org/10.13335/j.1000-3673.pst.2014.05.010
2014-01-01
Abstract:The differences of two kinds of commonly used sequential Monte Carlo simulation methods, namely the state duration sampling (SDS) and time interval sampling (TIS), applied in power grid reliability assessment are analyzed and compared. In allusion to the features of low efficiency and high accuracy of SDS method and insufficient accuracy and high computation speed of TIS method, it is proposed by means of choosing suitable sampling intervals and using correction coefficient to correct the loss of load duration (LOLD) indicator directly related to sampling times to improve the simulation accuracy and computing speed of TIS method. The effectiveness of the proposed method is validated by simulation results of IEEE-RTS79, and it is indicated that the modified TIS method possesses evident superiority in efficiency while the power grid failure rate increases.
What problem does this paper attempt to address?