Bidding decision model of cascade hydropower taking part in power generation rights trading considering water flow compensation risk

Yang WU,Junyong LIU,Yue SHUI,Hongjun GAO,Zhanxin YAN,Li ZHANG
DOI: https://doi.org/10.16081/j.issn.1006-6047.2018.02.012
2018-01-01
Abstract:Approaches to make bidding decisions under water flow compensation risks caused by the uncertainty of natural inflow represent a necessary problem that should be considered for the cascade hydropower taking part in PGRT(Power Generation Rights Trading).Motivated by this,the bidding decision model of cascade hydropower taking part in PGRT considering compensation risks is proposed.The impacts on PGRT caused by compensation risks are analyzed.Then,the model of CC (Cascade Community) considering complex system characteristics of interaction between cascade hydropower stations is illustrated based on cellular automata theory.According to the water flow compensation function,the upstream and downstream stations in CC are divided into the leading and basic cells.The quantity of compensating water,quantity of power generation fights bidding and price are selected as the attributes of the cells.Then,the state models and state transition models of leading and basic cells are constructed based on the principles of risk management and hydropower generation theory,respectively.Consequently,the relationship between the compensation risks and the output of CC is established.To maximize the bid quantity of CC,the upstream and downstream cells interact with each other according to neighborhood relationships,and the bidding decision model of CC is proposed based on the principles of hydropower generation and other factors.
What problem does this paper attempt to address?