Review of DG planning considering uncertainties for distribution network

Shenxi ZHANG,Haozhong CHENG,Haijun XING,Liangzhong YAO,Yi ZHANG
DOI: https://doi.org/10.16081/j.issn.1006-6047.2016.08.001
2016-01-01
Abstract:The integration of intermittent DG(Distributed Generation) increases greatly the uncertain factors of distribution network,which brings new challenge to its planning.The modeling of the uncertain factors brought by wind turbine generators,photovoltaic generators,loads,and so on during the planning stage is introduced.The DG planning methods considering uncertainties for traditional distribution network are commented,including multi-scenario planning,chance-constrained planning and fuzzy planning.The active distribution network planning methods considering uncertainties are summarized,including single-level planning and bi-level planning.Furthermore,the theory and methodologies of DG planning considering uncertainties,which may arise for the future distribution network,are prospected in the aspects of coordinated grid-source planning,risk planning,DG planning considering life-cycle cost,DG planning considering demand-side management,DG planning considering energy storage system,etc.
What problem does this paper attempt to address?