Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time

Zhi-Qiang LU,Xin-Yi LIU
DOI: https://doi.org/10.16383/j.aas.2017.c160834
2018-01-01
Abstract:Most studies in the literature so far assume that resources can be transferred from one job to the other without any expense of time. However, in many practical cases, it takes time for resources to transfer from one job to another. In this paper, we introduce the resource-constrained project scheduling problem (RCPSP) considering resource transfer time, which aims at minimizing the makespan of the project. A linear model is established and a branch-and-bound embedded genetic algorithm is proposed. A new precedence-based coding method which adapts to the structure of the problem is also proposed. Comparative computational results reveal that the branch-and-bound embedded genetic algorithm improves about 10% in terms of solution accuracy compared with the algorithm proposed in the literature.
What problem does this paper attempt to address?