Requirements of wide-area measurement system for power system security protection
Bao Hui Zhang
DOI: https://doi.org/10.1049/cp:20062276
2006-01-01
Abstract:In terms of theoretical analysis of the existing auto-mechanisms, such as overload protection, generator tripping, load shedding, the paper points out that these mechanism can't effectively prevent the cascading tripping of interconnection power system, sometimes expand power failure accidents. The reason lies in that the existing protections only utilize the local data and try to eliminate the faulted element or mal-operation condition as soon as possible without consideration of the impact to the whole system. These auto-mechanisms delayingly trip overloaded transmission components to ensure their security, and then the transmission capacity of the network is weakened. However, other mechanisms, such as tripping generator unit, load shedding, don't take action to lessen transmission requirement. Therefore, the cascading overload trip will arise on other transmission lines, even larger-scale blackouts. To ensure the security of power grids, it is necessary to set up the threefold line of defense for real-time control. The first line of defense is protective relay system, which can rapidly clear the fault. The protection system doesn't require wide-area measurement information. The second line of defense is held by the emergency control system, which maintains the stability and security of power system. This defensive line must keep the balance between the capacity of generating, transmission and real-time load. It utilizes the fast wide-area measurement system, including steady and dynamic information of power system, to hold back the development of instability and insecurity in time. The third line of defense consists of out-of-step separation system and fast restore unit, which divides the interconnection power system into some electrical islands to insulate the fault. Based on the wide-area steady and dynamic measurement information, the third defensive line can shorten the capacity and duration of power cut. Wide-area steady measurement information includes operating information and topology information of generating components, transmission components and loads. The update cycle of the information could be 1 to 2 seconds. Wide-area dynamic measurement information describes the dynamic behavior of electrical elements and power system, in respond to dynamic trend of power system and the close extent between system trajectory and the prearranged object after emergency control. The dynamic information mostly includes the rotor angle (not the phase angle of buses), total unbalanced power, power flow of key tie lines, voltage and frequency of load-centre substations. The update cycle of the information could be 20 to 40 milliseconds. In general, it is possible to modify the existing decentralized auto-mechanisms as the foreside of information collection and control operation, add the network of information interchange or accelerate the efficiency of information interchange, append control key station that carries out the computation of control scheme and conveys the control command to the dispersive installed auto-mechanisms. Such wide-area security and stability emergency control system may be economical and practical. (2 pages)