A Robust Optimal Shunt Dispatch Method In Wind Farm Integration Area

Fengda Xu,Qinglai Guo,Hongbin Sun,Boming Zhang,Lin Jia
DOI: https://doi.org/10.1049/joe.2017.0647
2017-01-01
Abstract:For a transmission system with large scale of wind farm integration, dispatch of discrete shunt capacitor/reactor banks that affects the long-term system operation has to consider huge wind power uncertainties. This paper describes a day-ahead assessment to gain the shunt switching time intervals. Based on it, wind curtailments, discrete shunts and other continuous reactive power outputs are optimized to minimize the voltage deviat ions of pilot buses in the worst circumstance on the premise of system safety. Alongside, the voltage control decisions are made within a minimum cost of wind curtailments and shunt switching. The approach is calculated from a two-stage robust optimizat ion problem with mixed integer. Control strategies derived from it is tested on a wind power integration system in China. Simulation shows positive results of the proposed method.
What problem does this paper attempt to address?