Heuristics for Aircraft Moving Assembly Line Scheduling Problem

Qian ZHENG,Li-feng XI
DOI: https://doi.org/10.3969/j.issn.1007-5429.2015.02.018
2015-01-01
Abstract:Aircraft moving assembly line scheduling problem(AMALSP)is defined as project scheduling problem with specific constraints.Based on the analysis of the multiple constraints in the aircraft moving assembly line,a model with the objective of minimizing the makespan is established.Solving this problem involves two stages of the decision:the priority ordering of work elements and the distribution decision of workers.Twenty-seven heuristic methodologies are compared on 250 test problems divided into five subset containing 20,50,100,200 and 500work elements.The computational results allow us to identify the most efficient heuristic methodologies.
What problem does this paper attempt to address?