Theory and Realization of Supervision and Control System for Tunneling Machine

魏建华,宋德玉,陈宁
DOI: https://doi.org/10.3321/j.issn:0253-9993.2004.04.023
2004-01-01
Abstract:Visualized supervision and control system for shield tunnel boring machine was developed, according to the request of the upper workstation. The hardware design and software structure were introduced. Specially, logical judgment of working state and static and dynamic prediction model of earth surface level variation were given and analyzed. The solutions to avoid land surface sedimentation accruing were brought forward: ensuring the working state of the programs precisely at any time according to running state of the tunneling machine with using logical judgment formula; forecasting the quantities of the surface sedimentation comparatively exactly by evaluating on-line and visualized supervision means. It is testified that the system can supervise multi-subject, can forecast exactly, as well as can realize visualized evaluation and prediction on line.
What problem does this paper attempt to address?