Integrated Scheduling for a Distributed Manufacturing System: a Stochastic Multi-Objective Model.

Yaping Fu,Hongfeng Wang,Min Huang
DOI: https://doi.org/10.1080/17517575.2018.1545160
2018-01-01
Enterprise Information Systems
Abstract:This study investigates and studies an integrated scheduling problem in a distributed manufacturing system that comprises multiple distributed factories, each of which has one independent flow shop with different numbers of serial machines. A stochastic multi-objective model is built with consideration of two criteria of scheduling and uncertainties of the operation process. A multi-objective brain storm optimization algorithm is designed to solve the model. Through a comparison with two state-of-the-art multi-objective algorithms, the experimental results indicate that the proposed model is effective, and the proposed algorithm can achieve satisfactory performance.
What problem does this paper attempt to address?