Cross Docking Scheduling Model and Heuristics to Minimize the Number of Tardy Jobs

俞亮,陈峰
DOI: https://doi.org/10.16183/j.cnki.jsjtu.2009.12.028
2009-01-01
Abstract:This paper studied the two-stage cross docking scheduling problem with the objective to minimize the number of tardy jobs.Firstly,a mixed integer linear programming is built.Secondly,an EDD-based heuristics is presented to solve this problem in large scale.Moreover,a lower bound is constructed.Finally,computational experiments are given to show that our heuristics can solve the problem efficiently.