Design of Two Kinds of New Dispatching Modes for Guangdong Power Grid

CHEN Dong,YI Shi-min,LIN Shao-hua,WEN Fu-shuan
2009-01-01
Abstract:It is expected by the model created in this paper that the dispatchers in Guangdong Power Grid will face with too much workload in the year of 2010.Based on the analysis and calculation two kinds of new dispatching modes are proposed:one is to set up a centralized control center and the other is to found a new dispatching framework.Both of them are to be validated through practice for their correctness and feasibility.
What problem does this paper attempt to address?