Research on Optimization of Wells in Longzi Lake in Zhengdong Area

LI Zhi-ping,CHEN Xiao-gang,HE Bing,DONG Gui-ming,LI De-ying
DOI: https://doi.org/10.3969/j.issn.1672-3317.2007.02.015
2007-01-01
Abstract:Groundwater will lately be exploited to supply for Longzi Lake in Zhengdong area.In this paper Aqua3D definite element software is used for research on wells optimization.In mode 1: rainwater is not considered,and groundwater is exploited only for lake;the total yield of 14 wells is 274×104 m3/a,and that of every well is equal;water level drawdown is little(only 1~2 m) without cone of depression,and this would lead to soil salinization.In mode 2: rainwater is not used,and groundwater is exploited not only for lake but also for colleges;the total yield of 20 wells is 1049×104 m3/a,and that of every well is equal;the biggest water level drawdown is 8.5 m with a cone of depression on the north of lake,and this would influence the adjacent work.In mode 3: the total yield is 593×104 m3/a;there are 3 plans including even exploitation of 14 wells in plan 1 and uneven exploitation of 14 wells in plan 2 and 12 wells in plan 3;the biggest water level drawdown of three plans are 4.6、4.3 and 4.2 m with a cone of depression on the east of lake in each plan.Mode 3 is a efficient water supply mode because of rainwater usage and combined water supply between Longzi Lake and colleges,and plan 3 is considered best due to its least drawdown.
What problem does this paper attempt to address?