Research of the construction of AVC substation of power plant of Guangdong power grid

LI Qin,WEN Bai-jian
DOI: https://doi.org/10.3969/j.issn.1674-3415.2008.21.008
2008-01-01
Abstract:According to the construction of Automatic Voltage Control System of Guangdong power grid,some problems appeared in engineering application such as the whole structure design of AVC substation of power plant,the measurements of the AVC master station’s requirement,the consideration of the safety and reliability of control,the switching logical of control schema,and the principle of exception handling,etc,are analyzed.And this paper presents a solution for the AVC master station to control different AVC substations of power plants coordinated.