Electric Power Networks Flexible Planning Via the Blind Model (BM) of Unascertained Number

程浩忠,朱海峰,王建民,陈春霖,房岭峰,江峰青
DOI: https://doi.org/10.3321/j.issn:1006-2467.2003.09.005
2003-01-01
Abstract:The unascertained number (UN) was used to deal with the uncertainty of electric power networks planning. A novel method of electric power networks flexible planning was presented based on the blind model (BM) of UN. Then the optimal flexible planning can be obtained by using the analysis of cost-benefit. This method was proved in some test examples. The analysis shows that the blind model and its strategy is flexible and effective.
What problem does this paper attempt to address?