Scheduling Reclaimer Operations in the Stockyard to Minimize Makespan

Chao Wang,Xi-wen Lu,René Sitters
DOI: https://doi.org/10.1007/s10255-018-0758-6
2018-01-01
Acta Mathematicae Applicatae Sinica English Series
Abstract:This paper considers a reclaimer scheduling problem in which one has to collect bulk material from stockpiles in the quay in such a way that the time used is minimized. When reclaimers are allowed to work on the same stockpile simultaneously, a fully polynomial time approximation scheme (FPTAS) is designed. Further, we present a 2-approximation algorithm in the case that any stockpile can be handled by only one reclaimer at a time. When the number of reclaimers is two, we give a 3/2-approximation algorithm. Numerical experiments show that the algorithms perform much better than our worst case analysis guarantees.
What problem does this paper attempt to address?