Re-planning strategies for space station on-orbit activities executed in emergencies

Shuai Mu,Ya-zhong Luo,Dong-yang Qiu,Jun Liang
DOI: https://doi.org/10.1016/j.actaastro.2018.07.030
IF: 2.954
2018-01-01
Acta Astronautica
Abstract:In this paper, we develop strategies for the problem of space station on-orbit activity re-planning. Considering the effects of emergencies, a preprocessed strategy is firstly proposed to reconstruct conflicting missions. Furthermore, a greedy algorithm with interval-based strategies is used to re-plan the activities of the reconstructed missions by utilizing mission priority and preplanned activity schedule intervals. Taking into account the propagation of complicated constraints, a time backtrack iteration strategy is adopted to solve constraint conflicts. We demonstrate the proposed approach with a notional operation scenario of the Chinese future space station. The results indicate that our method can successfully re-plan space station on-orbit activities when emergencies occur, all constraint conflicts can be solved, and mission accomplishment rate is increased, in comparison with a method that does not include re-planning strategies.
What problem does this paper attempt to address?