Three-stage Optimization Method for the Problem of Scheduling Additional Trains on a High-Speed Rail Corridor

Yuan Gao,Leo Kroon,Lixing Yang,Ziyou Gao
DOI: https://doi.org/10.1016/j.omega.2017.08.018
IF: 8.673
2017-01-01
Omega
Abstract:When scheduling additional trains into a busy timetable, the arrival and departure times of existing trains may have to be adjusted. Taking a high-speed rail corridor as the research object, we formulate a bi-objective mixed integer linear programming model to generate a new timetable for both of the additional trains and the existing trains, which minimizes the total travel time of the additional trains and minimizes the adjustment on the existing trains at the same time. In order to better model the operations of trains on the high-speed rail line, the capacities of the stations and the acceleration/deceleration times are all taken into account Furthermore, we propose a three-stage optimization method to solve the bi-objective model. Based on the real data of the Hangzhou-Ningbo-Wenzhou high-speed rail corridor in China, computational experiments are carried out to test the proposed model and optimization method. (C) 2017 Elsevier Ltd. All rights reserved.
What problem does this paper attempt to address?