Dynamic correction of coal mine three-dimensional geological model

SUN Zhen-ming,MAO Shan-jun,QI He-gang,LI Zhong-xue,LI Mei
DOI: https://doi.org/10.13225/j.cnki.jccs.2013.1051
2014-01-01
Abstract:Because of the dynamic characteristic of the production data in coal mine,plane maps,section maps and thethree-dimensional geological model of the coal mine should be dynamically corrected and updated,and then the under-ground objects can be controlled more and more accurately. However,the existing researches of three-dimensional geo-logical models are based on static modeling method,which led to the complexity of the model updating process. It'snecessary to study the dynamic modeling method further. Firstly,the new theory of dynamic correction of coal mine 3Dgeological model using the latest production data and correction model data was presented. Secondly,based on the 3Dgeological model data,the key techniques used in the system implementation were studied,such as plane-section corre-sponding algorithm,expanding search algorithm,partially curved surface algorithm,smooth transition algorithm,etc.And the partially correction and updating of coal mine 3D model was realized. Finally,the established coal mine 3Dgeological model can be updated and corrected using various kinds of the latest data in time,and can correctly reflectthe current situation of the production. Using those techniques,the automation of dynamic updating and practicabilityof the 3D geological model would be improved. The practical application of relevant results in Wangjialing Coal Mineproved the validity of research methods.
What problem does this paper attempt to address?