Abstract:For the past few years, the pipeline accidents have occured frequently, and usually the accidents have a tremendous impact.So people pay more and more attention to the pipeline safety.Ordinarily, the pipeline is ar-ranged as a line, unavoidable, there would be new construction along the pipeline, and some of them have to take the blasting work.The safety and plan of blasting work near pipeline were mainly studied.Also, the safe distance was suggested by numerical simulation.It showed that it is quite dangerous to carry on blasting near the pipeline with case 1, 2 and 3, and blasting work can be used with the improved plan.The static blasting and mechanical excavation should be used as far as possible in 50m away from the pipeline.
What problem does this paper attempt to address?