Analysis of Slip-Risk and Dynamic Monitoring of a High Building Slope Fringed a Deep-Founding Pit

Qi-yun WANG,Dan-ping GU,Jia-sheng ZHANG,Zhi-biao XIONG
DOI: https://doi.org/10.3969/j.issn.1009-6094.2011.02.038
2011-01-01
Applied Mechanics and Materials
Abstract:The paper intends to report our analysis of slip-risk and dynamic monitoring of a high building slop fringed a deep-founding pit.In our paper,we trial-used the combination of a single row of artificially -dug-up piles and pre-stressed anchor rope as the barcing system for the foundation pit in the complicated surroundings,with soil nail wall put on partial side.A slope was supposed to be built near the southern side of the pit supported with an anchor-plate retaining structure.In the process of excavation,monitoring was to be done to see if any horizontal displacement,deformation of deep soil took place with the axial load of anchor rope getting loose or any technical data and code dispatched from the demand.The pit-monitoring results we have found indicate that the pile-anchor system helps to control the deformation effectively,whereas the axial load of anchor rope was discovered fluctuating to increase or decrease in the process of excavation with the average change being about 11%.The slope monitoring results show that the axial load of the rope has somewhat enhanced due to the rainfall.In addition,the pre-stressed loss after being locked was found to exceed 10% because of intensive stretching of the adjoining ropes,the rotative boring of the anchor rope against the stabilization and deformation-increase of the unstable slope.In the process of excavation,the deformation in some parts was found too big and resulted in a dangerous state.While keeping tracing the dangerous state of the side of the foundation pit,we have depicting the deformation and the unstable part of the anchoring device with its axial loading in a close way.As a result of comprehensive analysis,design, construction and monitoring,we have concluded that dangerous situation took place for the reason that the overbreak,explosive excavation, rainfall and so on are all the factors contribute to the hazardous state.Seeing there exist all these problems,we have proposed corresponding emergency measures and reinforcement measures, which proved to be highly effective,particularly those on monitoring after reinforcement.
What problem does this paper attempt to address?