Finite Element Analysis of Stability of Excavation Reinforcement Construction for High Fracture Rock Slope

王俊杰,邱珍锋
2014-01-01
Abstract:Taking water intake of Jinfoshan hydraulic engineering for an example,combined with the change of displacement,potential sliding surface and shear strain,the deformation and stability of high fracture rock slope in the construction of stepped excavation and reinforcement are studied from aspects of slope's size and shape,failure mechanism and stability.The results show that in the construction of stepped excavation and strengthening,the safety factor and deformation of slope meet the technical specification for construction of water resources and hydropower engineering slope; it may become a deep and composite mechanism of the potential landslide;sliding surface is divided into tensile splitting segment,straight line and circular section;the displacement of top slope appears sudden change after the first excavation, then it gradually becomes stable while the followed construction;the stability of rock slope is improved obviously after strengthened.
What problem does this paper attempt to address?